Major Questions:
6/18/01
Answered 06/19/01
New questions
| 1 | Since we are required to remove/replace the Curb and Driveway apron
along the entire property, should we design what is on the Architects Site
Plan,
OR the Landscaping plan. As shown, there is significant difference. Design entry area per LANDSCAPE PLAN.
|
| 2 | Do we need to add a step due to the grade on this entry?
Yes, we need 1 step |
| 3 | If we do NOT replace the sidewalk, are we required do anything about
runoff crossing the sidewalk in the Existing Condition?
N/A |
| 4 | In the Sewer Easement, the proposed patio (A) and Proposed East Sidewalk
(B) are supposed to be Non-Permanent materials. Can the patio be constructed
with Non-Permanent materials.
The Existing West Sidewalk (C) is existing. Are we being required to replace? YES
|
| 5 | Items we are waiting for...
a) Lead & Tag from Surveyor. b) Hydro Calcs. from IKE. c) Soils Signatures |
| 6 | On 1602, there was no mention of Lead & Tag.
This is what we did on 502 Ocean (06/05/00).
These are notes from 506 Ocean. 9/13/99
So... in conclusion, it seem that we need to remind
the reviewer of sections 111.6.2 and 115 of the Seal Beach Standard Grading
plan notes.
|